SMOOTH OUT CONCRETE IN SEGMENTS TO ENSURE THE CONCRETE POURED IS LEVEL ARRANGE THE CONCRETE FORMS, SPREAD CONCRETE, PREPARE SURFACES WITH HAMMER, AND CHOSE, RUB CEMENT IN WITH SPONGE/RUBBER FLOAT OR BURLAP, PREPARE SHEET ROCK WALLS INSPECT AND REPLACE DAMAGE FRAMEWORK OR OTHER STRUCTURES AND FIXTURES
6 days remaining